  某工程施工组织设计
  摘要
  施工组织设计是建筑施工组织的核心和灵魂,是对工程建设项目全过程的构思设想和具体安排,用来指导施工项目全过程各项活动的技术、经济和组织的综合性文件。
  本施工组织设计是针对洛阳市西工区御博37#楼工程设计方案的纲领性文件。编制时对项日管理机构设置、施工总体部署、施工准备、主要分部分项工程施工方法、工程质量保证措施、安全及文明施工措施、施工现场管理措施等诸多因素尽可能充分考虑,突出科学性、适用性及针对性,是确保优质、低耗、安全、文明、高速完成全部施工任务的重要经济技术文件。
  本设计主要包括以下内容:工程施工组织设计书、施工平面布置图。为确保工期、质量及安全、文明工地,节约成本等条件,编制出针对性的施工组织设计,每个分部分项工程的特点、结构特征、施工难易程度工期和质量要求,编制出切实可行的施工方案。以指导施工顺利地完成本工程项目的建设,控制工程成本,创建优质工程。
  关键词:安全质量成本进度控制
  Construction organization design of a project
  abstract
  Construction organization design is the core and soul of construction organization.It is the conception and specific arrangement of the whole process of engineering construction project.It is a comprehensive document used to guide the technology,economy and organization of various activities in the whole process of construction project.
  The construction organization design is a programmatic document for the design scheme of Yubo 37#building project in Xigong District,Luoyang City.During preparation,many factors such as the setting of project management organization,overall construction deployment,construction preparation,construction methods of main divisional and subdivisional works,project quality assurance measures,safety and civilized construction measures,construction site management measures and so on shall be fully considered as much as possible,highlighting scientificity,applicability and pertinence.It is an important economic and technical document to ensure high-quality,low consumption,safe,civilized and high-speed completion of all construction tasks.
  The design mainly includes the following contents:project construction organization design,construction layout plan.In order to ensure the construction period,quality,safety,civilized construction site,cost saving and other conditions,formulate targeted construction organization design,the characteristics,structural characteristics,construction difficulty,construction period and quality requirements of each divisional and subdivisional project,and prepare practical and feasible construction scheme.To guide the construction,successfully complete the construction of the project,control the project cost and create a high-quality project.
  Key words:safety quality cost schedule control