毕设基本摘要
摘 要
本毕业设计主要包括两个部分,第一部分是江海路站基坑围护结构设计;第二部分是江海路站基坑施工组织设计。
在第一部分基坑围护结构设计中,根据基坑所在地层的工程地质、水文地质条件和周边环境情况,通过施工方案的比选,确定采用地下连续墙围护方案和钢管支撑,并进行支撑的强度验算和地下连续墙的配筋验算。
第二部分是基坑施工组织设计,根据基坑施工方案和基坑周边的环境情况,对施工前准备工作,施工场地布置,地下连续墙和支撑的施工工序等进行设计,并编制了工程进度计划,编写了相应的质量、安全、环境保护等措施。
关键词:基坑; 地下连续墙; 施工组织
ABSTRACT
This graduation design mainly includes three parts, the first part is a design of foundationpit for JiangHaiLu Station metro station in WuXi. The second part is the design of JiangHaiLu Station foundation pit construction organization.
In the first part, according to the engineering geology, the hydrology geology conditions and environment circumstances of the foundation pit located, through comparing the construction schemes, confirm that the underground continuous wall was used as the fender and steel pipe as the support, and carry on strength's check computation on support and distributed steels computation of the underground continuous wall.
The second part is the foundation pit tunnel construction organization design, according to the construction schemes and the environment circumstance of the foundation pit, designing the construction preparative, the construction place arrange, construction technology and processes of the underground continuous wall and the support. Estimating the work project, weaving to write the homologous quantity、safety、civilization management measure.
Keyword: foundation pit; underground continuous wall; construction management