摘要:本次设计课题为某江河水闸工程,设计的主要任务是对该枢纽中的水闸进行全面的结构选型设计和定性的论证枢纽总体布置方案。将我们在大学期间所学的课程知识加以系统化,巩固和加深。通过设计使我们掌握了水闸设计的几方面内容:枢纽布置;闸室布置;两岸连接建筑物设计;消能防冲设计;防渗排水设计;闸室稳定计算;水闸沉降量计算;水闸主要结构设计。其中水闸沉降量计算和水闸主要结构设计未进行设计。
关键词:水闸建筑物 水闸布置 消能防冲 防渗排水 闸室稳定
Summary : Design the subject as river floodgate project this time, the main task designed is to carry on the overall selection of structure and design and fix up the scheme with the qualitative demonstration pivot overallly to the sluice among this pivot. The course knowledge of studying us during university is systematized , consolidate and strengthen. Content through designing several respects of making us grasp the design of floodgate of water: The pivot is fixed up; The floodgate room is fixed up; Two sides join the building to design; Disappear and can defend and print designing ; The prevention of seepage drains off water and designs; The floodgate room is calculated steadily; The subsiding amount of the sluice is calculated; Main structural design of the sluice . The subsiding amount of the sluice calculate and the main structural design of sluice has not carried on the design among them.
Keyword: Sluice building The sluice is fixed up Disappear and can defend and wash The prevention of seepage drains off water The floodgate room is steady