资料简介: Bridge Construction and Design temporary restraiAbstract End bridge work in the construction process, selection,design,and Construction equipment used in the production process of the construction processwillbe an important task indispensable; Construction will be completed in the massive temporary structures. Accordingly construction of temporary structures, we must consider all factors and make careful analysis of the structure. also made in accordancewiththe actual construction, the construction of the structure to ensure safety and quality.2 H; z. J) G9 E ^4 p: i5 H F) Y0 v
Keywords Temporary constraint Construction Design桥梁中临时约束的施工与设计
( U: l2 S/ o+ J5 D' t; T( X3 D 摘要 在桥梁施工过程中,选择、设计、制作施工过程中使用的设备是施工过程必不可缺少的一项重要任务,而且在施工完成后会产生大量的临时结构物。因此在进行施工临时结构时,必须全面考虑各种因素,进行认真细致的结构计算分析,同时作出符合工程实际的施工方案,以确保结构施工的安全和质量。
1 O |2 K# M4 i1 P. G; W" r3 d: n) G2 K 关键词 临时约束 施工 设计 |