资料简介: 摘要,大桥是XX高速公路中的一段重要桥梁工程,它位于XX村附近,大桥全长216.08m。桥身采用7孔,每个孔径为30m。上部构造为简支连续预应力混凝土箱梁,下部构造为柱式桥墩肋板式桥台、冲抓锥钻孔桩基础,它属于技术复杂大桥。
本毕业设计以XX大桥的构造图纸和地理地质资料为依据进行编制施工组织设计,其内容包括施工工期、施工进度、施工组织、施工方法和工程注意事项,此施工组织设计分部、分项工程严格遵循施工规范和要求。本桥预算以施工组织设计为依据,根据各项工程要求对工程材料工程器械人工使用情况,配备足够的施工队伍和机械设备,合理优化设计方案、严格保证工期。
关键词 简支转连续 预应力 箱梁 施工组织 预算
Abstract,It is located in the vicinity of the village Pair, Bridge 216.08 m length. XXX bridge is XXX section of the highway bridge project. Bridge body seven holes,each 30m aperture.Construction of the upper simple continuous prestressed concrete girder structures in the lower rib plate pole pier abutment,Cone-grabbing bored pile foundation,it belongs to the technical complexities Bridge.
The graduation design Songjiagou Bridge Construction drawings geological and geographical information as the basis for the preparation of construction design,its contents including engineering profile construction periodand the progress of construction,construction methods and engineering considerations. Construction of this design division,sub-projects strictly follow construction norms and requirements. The budget for the bridge construction designbasis; According to various engineering requirements of engineering materials engineering tools and the use of artificial,construction equipped with sufficient force and mechanical equipment; Optimizing the design of the program,a strict time limit.
Keywords SR-continuous Prestressed Box Girder Construction Organization Budget
|