摘要,公司综合楼工程位于市区北面东侧,总建筑面积5603.9m2。设计研究院设计,整个用地呈长方形布置。结构形式6层均为砖混结构。
根据该工程工程图纸及相关资料,编制了本次设计,该《施工组织设计》是指导综合办公楼工程施工的纲领性文件。建筑施工是一项繁杂的多工种、多材料的露天操作的系统工程,要多快好省,保质保量完成合同所要求的质量、工期,必须按建筑施工程序办事。编制时对项目管理机构设置、劳动力组织、施工进度计划控制、机械设备及周转材料配备、主要分部分项工程施工方法、工程质量控制措施、安全生产保证措施、文明施工及环境保护措施、降低成本措施、推广新技术、工程技术资料管理、成本控制、材料采购以及工程回访等诸多因素尽可能充分考虑,突出科学性、适用性及针对性,是确保优质、低耗、安全、文明、高速完成全部施工任务的重要经济技术文件。目的是使工程速度快、质量好、效益高,使整个工程在施工中获得相对的最优效果。
为确保工期、质量及安全、文明工地,节约成本等条件,编制出针对性的施工组织设计,以指导施工顺利地完成本工程项目的建设。大力推广应用新技术、新工艺、新材料,控制工程成本,缩短工期,创建优质工程。本次设计主要包括以下内容:工程量计算书、工程施工组织设计书、施工进度表、施工平面布置图,劳动力、材料、机械需要量表,安全技术措施方案。
关键词:工程进度、施工组织、部门协作、施工工艺。
Abstract,The Comprehensive buildings project of De Zhou city Shi Yue Limited Liability Company is located in De Zhou city the north east side, with a total construction area of 5603.9m2. De Zhou Institute of Architectural Design designed the entire site was a rectangular layout. Structural forms: the underlying framework, 6-storey brick-concrete structure all.
In according to the Building engineering drawings and related engineering data in this design, the "construction design" is De Zhou Building Construction Program documents. Construction is a more complicated type of work, multi-material systems engineering open-air operation, it is necessary to Better , faster and more economically , quality and quantity required to complete the quality of contracts, construction, construction work must be procedures. The preparation of project management at the institutions, labor organizations, the construction schedule control, mechanical equipment and is equipped with working materials, the main sub-component construction methods, engineering, quality control measures, measures to ensure safety in production and civilized construction and environmental protection measures, to reduce costs measures to promote new technologies, engineering data management, cost control, materials procurement as well as visit a number of factors such as the fullest possible consideration, highlighting the scientific nature, applicability and relevance, is to ensure that high-quality, low power, safe, civilized, high-speed completion All the important task of economic construction technical documents. The purpose is to make the project faster, good quality and high efficiency so that the whole construction project was the relative effect of the optimal.
To ensure that the project, quality and safety and civilized construction site, cost savings and other conditions, the preparation of a specific construction design, to guide the construction of the successful completion of the construction of this project. To promote the application of new technologies, new processes, control of project costs and shorten the construction period and create high-quality project. The design includes the following: in terms of engineering, engineering construction design documents, construction schedules, construction layout plans, labor, materials, machinery need to scale, safety technology program.Keywords: progress of the project, construction organizations, the departmental co-operation, the construction process.