    土木工程施工组织设计摘要范文

    资料分类:土木工程设计资料 - 论文摘要范文参考资料 | 发布形式:资料共享 | 更新时间:2017-08-16 显示全部楼层

      摘  要
      企业在市场环境急剧变化,市场竞争激烈的情况下,要在保证项目工期,安全,质量等的前提下获取企业利润,这就要求企业不断改善经营管理,提高施工技术水平,确保工程质量,获取经济效益。为此,在项目施工进行之前,必须做好施工组织设计。
      本设计通过对目标项目的分析、了解,结合施工设计图纸,针对该项目编制合理的施工组织设计,实现基本建设计划和实际要求,对整个工程的施工选择科学的施工方案和合理的安排,从而协调各施工单位、各工种之间、资源与时间之间、各资源之间的合理关系。在整个施工过程中,按照客观的经济、技术规律,做出合理、先进、科学的安排,使整个工程在施工中取得相对最优的效果。
      本设计的研究就是要帮助企业降低成本,缩短工期,战胜对手,赢得竞争,作为工程施工的总体规划 ,我们要通过对复杂生产过程的科学、经济、合理的规划安排 ,考虑全局、统筹兼顾,并使建设项目能够实现连续、均衡而有节奏地进行施工 ,以满足建设项目对工期、质量及投资方面全方位的计划管理。
      关键词:施工;工期;质量;技术

      Abstract
      Along with the rapidly changing of the market environment and severe market competition, enterprises intend to obtain corporate profits under the premise of time limit, security, and quality, which requires continuous improvement of enterprise management and the level of construction technology, ensuring the quality of the project, and having access to economic benefits. To achieve this target, they have to prepare well enough in construction design before the construction of the project.
      Aiming at the project, this design works out a reasonable organizational design through analysis and understanding of the project, combined with the construction design drawings, to accomplish the essential construction plan and the actual requirements, choosing a scientific implementation plan and reasonable arrangement for the whole project, so as to coordinate the reasonable relations of the construction units, the various types of jobs, resources and time, varieties of resources. Throughout the whole construction process, this design makes out reasonable, advanced and scientific arrangements in accordance with the objective economic and technological laws, to enable the implementation of the whole project to have a relatively optimal result.
      This study is designed to help enterprises reduce costs, shorten the construction period and win the competition. As the overall planning of construction, we must deal with the production process with complex scientific, economic, and rational planning arrangements, and then take the overall situation into consideration as well as implement the construction projects rhythmically and continuously in order to meet the needs of construction projects on the project, quality and investment in a full range of program management.
      Key words: Construction;Time limit for a project;Quality;Technology