    楼房施工组织设计中英文摘要范例

    资料分类:土木工程设计资料 - 论文摘要范文参考资料 | 发布形式:资料共享 | 更新时间:2018-09-09 显示全部楼层

      本文已镇江市熙湖安置房10号楼施工项目为实例,根据毕业设计要求,结合本工程具体情况和有关现行规范等资料,对本项目的施工方案进行了详细的设计。
      本工程为框架剪力墙结构,地上6层,地下2层,总建筑面积6910㎡;施工现场的工程地质与水文地质情况依据施工图纸确定;现场供电条件:供电容量满足施工用电要求;现场供水条件:采用城市供水管网,供水量满足施工要求;材料、构配件、施工机械及劳动力均满足正常施工的需要。
      本工程施工组织设计作为主导施工的依据,包括以下几个方面的内容:编制依据、工程概况、施工部署、施工准备、施工进度计划、施工平面布置、拟投入本工程资源计划、总承包管理协调配合方案、主要分部(分项)工程技术方案、专项施工方案和施工组织各项管理保证措施。编制时对目标工期、工程质量、项目管理机构设置、劳动力组织、施工进度计划控制、机械设备及周转材料配备、主要分部分项工程施工方案、安全保证措施、文明施工及环境保护措施、降低成本措施等诸多因素尽可能充分考虑,突出科学性及可行性。
      关键词:施工方案;进度计划;安全文明施工。
      This article has 10 housing for zhenjiang city lake floor construction project as an example, in accordance with the requirements of graduation design, combined with the project details and information about the current specification and so on, this construction method has carried on the detailed design of the project.
      This project for the frame shear wall structure, the ground six floors, underground 2 floors, a total construction area of 6910 ㎡. The engineering geology and hydrogeological conditions of the construction site are determined according to the construction drawings; On-site power supply condition: power supply capacity meets construction demand; On-site water supply condition: urban water supply pipe network, water supply meets construction requirements; Materials, components, construction machinery and labor force meet the need of normal construction.
      This project construction organization design as the basis of the leading construction, including the following aspects: the content of the compilation basis, project general situation, construction deployment, construction preparation, construction schedule, construction layout, plans to put into this project resource planning, general contracting management coordination scheme, main branch (breakdown) engineering, special construction scheme and construction organization management guarantee measures. Establishment of target period, when the project quality, project management organization setup, labor organization, construction schedule control, mechanical equipment and turnover materials equipment, the main partial project construction scheme, safety assurance measures, civilized construction and environmental protection measures, measures to reduce costs, and many other factors fully considered as far as possible, highlight the scientific nature and feasibility..
      Key Words: construction scheme, construction organization plan, schedule plan, safety precaution.