项目成本控制:它的工作方式

  Project Cost Control: The Way it Works7 l) ?( Y* j( g! ]4 }  P) P- o
  By R. Max Wideman- b9 [/ Q+ G+ k; x# g& t0 @- y
  In a recent consulting assignment we realized that there was some lack of understanding of the whole system of project cost control, how it is setup and applied. So we decided to write up a description of how it works. Project cost control is not that difficult to follow in theory.
2 t; D, X+ E  X: M  ^8 a1 [  First you establish a set of reference baselines. Then, as work progresses, you monitor the work, analyze the findings, forecast the end results and compare those with the reference baselines. If the end results are not satisfactory then you make adjustments as necessary to the work in progress, and repeat the cycle at suitable intervals. If the end results get really out of line with the baseline plan, you may have to change the plan. More likely, there will be (or have been) scope changes that change the reference baselines which means that every time that happens you have to change the baseline plan anyway.
8 |" E: g% {  f+ x- d/ l# D& r  项目成本控制:它的工作方式
' w5 Z; `+ P" e; H/ C3 a  R.马克斯怀德曼9 t' e8 x, ^/ @8 q) R6 w
  我们在最近的咨询任务中意识到,对于整个项目成本控制体系是如何设置和应用的这个问题,我们仍有一些缺乏了解。因此,我们决定写出它是如何工作的说明。从理论上讲,项目成本控制并不难。7 x3 O& b# D+ n6 M! q
  首先,建立一套参考基准。然后,按照工作的进展,监察工作,分析结果显示,预测最终结果并与参考基线作比较。如果最终结果不令人满意,那么你要对正在进行中的必要的工作进行调整,并在适当的时间间隔内重复循环。如果最终结果已经与基线计划脱节,你可能不得不改变计划。更有可能的是,将会有(或已经)变化的范围改变参考基线,这意味着,每一次范围发生变化,无论如何你都必须改变基线计划。  z8 p: s7 Y, K& @
外文文献翻译-项目成本控制:它的工作方式(1)
外文文献翻译-项目成本控制:它的工作方式(2)
外文文献翻译-项目成本控制:它的工作方式(3)
外文文献翻译-项目成本控制:它的工作方式(4)
外文文献翻译-项目成本控制:它的工作方式(5)
试读已经结束,如果需要阅读全文,请下载本文档

内容在线展示已结束,下载资料使用学习更方便

土木工程设计过程 分享网站网址一起学习

Current Value 11248
Update Date 2015-12-18
Trend Intensity Index

87

*资料为会员分享仅供学习参考,如有侵权请通知删除

热门分类 /

Hot Categories

最新资料 /

Latest Materials
Slideshow