[水利毕业设计文档] 复合土工膜面板堆石坝毕业设计

资料简介:

  摘  要,本次设计主要是开发利用B江流域的水利资源,建设一个以发电为主,同时兼顾灌溉、供水、防洪及养殖等综合利用的跨流域开发的水利水电枢纽工程。
  在明确了建设目的并具有了建设依据和条件后设计的枢纽概况如下:B江水利枢纽复合土工膜面板堆石坝高53米,装机6400KW,电站设计水头174米,保证出力1461KW,装有两台3200KW机组,主坝长215米左右,上游边坡1:1.5,下游边坡1:1.55。
  复合土工膜面板堆石坝是一种新坝型,其防渗材料---复合土工膜的设计、施工、质量控制是该类坝型的技术关键,在本设计说明书第六章有详细说明。
  本次设计以一般为参考,堆石坝在注重各细部独立分项设计的同时,综合考虑了整体工程的统一性。在设计过程中既充分运用了所学知识,有广泛参考了设计施工方面的有关书籍。当然,这都是在规范规定内作的设计,体现了科学性、规范性。关键词:复合土工膜,堆石坝,面板,边坡
  Abstract,This design is to develop and utilize B river water resource of  basin mainly, Build one rely mainly on generating electricity, give consideration to irrigate, supply water, prevent flood and the stepping the water conservancy water and electricity multi-purpose project developed in basin of comprehensive utilization of cultivating etc. at the same time.
  In build purpose and have build pivot general situation that basis and terms design as follows clearly: B river key water control project compound geotechnological panel rock-fill dam 53meter high membrane, installation 6400 KW, hydropower station design 174 meters of flood peaks, Guarantee and exert oneself 1461KW, equip with two 3200 KW unit, main dam 215 meters long and the slope at upriver is 1:1.5 while it is 1;1.55 at lower reaches.
  Compound geotechnological membrane panel rock-fill dam  is a  new dam type, its prevention of seepage. material ---Compound geotechnological design, construction, quality control of membrane the technological key of dam type, There is elaboration in chapter six of this design instruction .
  The design’s process above-mentioned is referenced to the former design of rock-fill dam ,in pay attention to every detail while  dividing items of design independently, consider whole unity of project synthetically this time. Use knowledge studied fully already in the course of designing , have and consult design and construction  relevant books of respect extensively. Certainly, this design that is made in the  regulation of standardizing , it  is  scientific, regulatory to reflect.
  Keywords: Compound geotechnological membrane, rock-fill dam,panel, slope
水利毕业设计文档-复合土工膜面板堆石坝毕业设计(1)
水利毕业设计文档-复合土工膜面板堆石坝毕业设计(2)
水利毕业设计文档-复合土工膜面板堆石坝毕业设计(3)
水利毕业设计文档-复合土工膜面板堆石坝毕业设计(4)
水利毕业设计文档-复合土工膜面板堆石坝毕业设计(5)
水利毕业设计文档-复合土工膜面板堆石坝毕业设计(6)
水利毕业设计文档-复合土工膜面板堆石坝毕业设计(7)
水利毕业设计文档-复合土工膜面板堆石坝毕业设计(8)

内容在线展示已结束,下载资料使用学习更方便

土木工程设计过程 分享网站网址一起学习

Current Value 8709
Update Date 2017-06-25
Trend Intensity Index

69

*资料为会员分享仅供学习参考,如有侵权请通知删除

热门分类 /

Hot Categories

最新资料 /

Latest Materials
Slideshow