摘 要
3#公寓楼,楼长60m,宽11.6m,建筑面积3556.8㎡。楼全高20.32m,共六层,一至六层层高均为3.0m,另有隔热层层高2.32m,室内外高差0.9m。采用混合结构,条形基础,二级耐火等级,使用年限50年,屋面防水等级3级,抗震设防烈度6度。施工组织设计本着遵守工程合同要求工期和本合同承诺的施工期限,合理安排施工程序与顺序的原则,以国家相应规范、标准为依据,完成了设计任务书所要求的施工组织设计,并在此基础上进行了施工平面图、组织施工和施工进度计划的设计。
关键词:组织施工、进度控制、平面布置图、质量控制
Abstract
apartment building 3#, floor length 60m, width 11.6m, construction area of 3556.8 square meters. Building a full height 20.32m, a total of six layers, one to six layers high are 3.0m, otherwise the heat insulation layer of high 2.32m, indoor and outdoor elevation 0.9m. Mixed structure, strip foundation, the two stage fire resistance rating, service life is 50 years, the roof waterproof grade 3, seismic fortification intensity of 6 degrees. The construction organization design in compliance with the requirements of the contract and the contract project time limit promised the construction period, the reasonable arrangement of construction procedure and the order principle, to the corresponding national standard, standard as the basis, the completion of the construction organization design task book requirements of the design, and on this basis for the design and construction plan, construction organization and construction schedule the.
Key words: The organization construction, progress control, layout, quality control
3#公寓楼工程施工组织设计.pdf
(912.41 KB, 下载次数: 3)
满意就快下载吧,纯word格式 |